CUTTINGS STABILIZATION

The quantity of dry solids stabilized per batch depends on the civil work design on location (waste pits, corral or tank ) The dry location concept  requires only the half moon tank. The quantity of cement depends of the dryness of the solids . Geosta is mixed in the range of 1kg / m3 to enforce the hardness and the compressive strength, and reduce the leachability .Samples are collected for leachate and compressive strength test .

Dry Location       dewatering unit